NOTICE TO CONTRACTORS. Trout Unlimited-Washington Water Project is proposing to construct a project on the Methow Valley Irrigation District Canal near Twisp, WA: Piping 23,590 l.f. of existing open canal between Twisp and Beaver Creek, with a steel temporary intake structure at the upper end. Tree removal within the 50 foot canal easement width will be an optional bid item. Contractor shall provide pipe, which can be either HDPE or PVC. Bidders must declare which kind of pipe will be used and base their bids on the pipe material they choose. Pre-bid site inspection at 1 PM on August 29, 2014, at the RiverBank Office, 206 Glover Street, Twisp WA. Contractors interested in receiving a bid solicitation packet should contact Project Administrative Assistant Katy Williams at 509 997-0640 x267 or email katy@vanheesllc.com prior to the bid opening at 5 PM on September 9, 2014.
Published in the Methow Valley News August 20 and 27, 2014.